Voyager 83 Pipeline Bundle
Final preperations are under way for the Pipeline Bundle Launch. The 6.3 Kilometers Bundle will get floated into position and flooded to the bottom of the sea bed.
Equinor Snorre Project
Launch Way
Fantastic Conditions for the beach launch
Wester bridge being lifted to accommodate the midline structure.